The site consists of a large reinforced concrete slab, with a powerfloat finish to very tight tolerances. The steel frame structure has been constructed to house the generation units. Roadways were also constructed along with reinforced transformer slabs.
Sudbury, Suffolk
Duration: 16 Weeks
Completion:
29 July 2017
Client: Edge Power Limited
Architect:
Engineer: Ross and Partners