The site consists of a large reinforced concrete slab, with a powerfloat finish to very tight tolerances. The steel frame structure has been constructed to house the generation units. Roadways were also constructed along with reinforced transformer slabs.



Location: Sudbury, Suffolk

Duration: 16 Weeks

Completion: 29 July 2017

Client: Edge Power Limited

Engineer: Ross and Partners

Value: £250,000